Friday, September 19, 2008

Log

Hello,

So far I am up to date on what is due according to my calendar. Everything is posted such as background information, design brief, brainstorming, alternate solutions, selection/rejection, summer research and testing procedures. I know I need to keep adding pictures and keep up with the drawings. I will be using CAD 2009 Architectural to do the exterior elevations of all walls with materials labeled and heights of floor and ceiling lines and window and door heights and dimensions. I will also be drawing exterior wall sections with all materials labeled and dimensioned with a roof pitch. This is what I will be working on next week during class so construction of the model can begin shortly after.

No comments: