Sunday, November 9, 2008

Log

Over the last few weeks I have been gathering information on building foundation, materials, facades and procedures. After speaking with my group members we decided on what materials we wanted the building to be made out of and what style roof. 

For the foundation were using concrete 8"x8" cinder blocks and building up the walls with the blocks. We are then putting gravel down before laying down the cement floor of the foundation. On top of the cinder blocks we will be using stucco because of the more natural and modern look to it. We also decided on a flat roof with overhangs near the main entrance and ambulance entrance as needed. This is the basic overview of what I have been working on and especially concentrated on according to the new job assignments within the group. 